Describe your house and explore an indicative estimate, down to concrete and steel quantities. This data-informed planning tool draws on Structa’s experience across more than 2,000 projects and a selected historical priced residential dataset. It is not a measured BOQ or a current tender quote.
A fixed illustration, separate from your interactive estimate: a two-storey, 2,200 sq ft house (1,200 sq ft ground floor plus 1,000 sq ft first floor), two bathrooms with shower cubicles, flat concrete roof, standard finishes, 2 ft soil filling and 5% contingency. No terrace, boundary wall, security, design package or price escalation is included.
Example total: LKR 25,570,688
Construction work: LKR 21,347,260
Materials and fittings: LKR 3,005,776
Extras and reserves: LKR 1,217,652
This is an indicative historical-model example, not a current quotation or a price guarantee. Land, approval fees and other exclusions listed below are not included. Change the inputs to explore your own project; obtain a site-specific measured BOQ before committing funds.
For a clean PDF, choose “Save as PDF” and turn off your browser’s “Headers and footers” print option.
Or call +94 77 889 2892 · hello@housedesign.lk
Where the money goes
Share of the estimate by trade.
Payments by construction stage
Roughly when each part of the money is needed, excluding extras and reserves.
Key quantities
Quantities for your house, scaled from Structa’s measured BOQs.
Indicative itemised estimate
work lines. Quantities scale with your inputs; unit rates come from historical priced project data and should be refreshed before use.
Compare finish levels
The same house at each finish level.
How this estimate is built
This data-informed tool draws on Structa’s experience across more than 2,000 projects. Its numerical model uses a selected set of historical priced residential records—not every project Structa has delivered. For each trade it estimates quantities per square metre of floor, bathroom or storey, then applies historical rates.
Your inputs scale those quantities. Rates are historical medians from the supplied model, and finishing-material allowances reflect different client budget levels. Material and labour prices can change; ask Structa to verify current rates for your site before making financial decisions.
The ±25% display is an illustrative planning band, not an accuracy guarantee. A site-specific measured BOQ is needed before financial decisions.
Rates used
Not included
Land, legal fees, and local-authority approval fees.
Soil investigation and special foundations such as piles. Weak ground needs an engineer’s assessment.
Ceilings. Structa’s standard finish is a painted concrete soffit.
Air conditioning, solar panels, landscaping, furniture and kitchen appliances.
Swimming pools and other one-off features.
Common questions
How much does it cost to build a house in Sri Lanka in 2026?
Historical residential median LKR 11,520 per sq ft; middle half LKR 9,772 to LKR 12,812 per sq ft. This includes major construction and finishes, but excludes land and approval fees.
How accurate is this calculator?
It is an early planning tool, not a quotation. The ±25% band is illustrative, not a guarantee. Ask Structa for a measured BOQ based on your drawings and site.
Why can two houses of the same size cost differently?
Storeys, bathrooms, roof, soil and finishes change the price. A third bathroom adds about LKR 255,675 to this typical example.
What is not included?
Land, approval fees, soil investigation, special foundations, ceilings, air conditioning, solar, landscaping, furniture and appliances.
Structa Engineering and Contractors (Pvt) Ltd · Colombo 03 · ISO 9001:2015 certified
This calculator gives an early estimate. Your exact price comes from a BOQ prepared for your drawings and site.
Prepared with Structa’s experience across 2,000+ projects and a selected historical priced residential dataset. This is not a quotation or measured BOQ.
Your project assumptions
Budget by work category
Work category
Estimated amount (LKR)
How to use this estimate
The figures are data-informed planning allowances based on historical residential pricing. Site conditions, engineering design, authority requirements, material choices and current procurement rates can change the final price. The displayed ±25% band is illustrative, not a prediction or guarantee. Ask Structa for a site-specific measured BOQ before committing funds.
From a budget to a buildable plan
Structa coordinates house planning, architectural design and 3D visualisation, structural engineering, interiors, electrical and plumbing drawings, approval documentation and bills of quantities.
Necessary storage remembers this choice. Structa currently loads no advertising
trackers; optional analytics will remain disabled unless you allow them.
Read the cookie policy.